Kannerstein Field renovation, 2011
Sept. 16, 2011
Sept. 16, 2011
Sept. 16, 2011
Sept. 16, 2011
Sept. 16, 2011
Sept. 22: The batting facility begins to take shape.
Sept. 22: The batting facility, from field side.
Sept. 22: Two of the foundation stanchion's for 30-foot poles that will support the backstop netting.
Sept. 22: The infield begins to regain its shape.
Sept. 22: The third base line looks slick, ready for countless Fords runners steaming toward home plate.
Sept. 28: The batting facility gets its roof.
Sept. 28: The batting facility with its sunlights along the roofline.
Sept. 28: Part of the drainage system is hard at work already.
Sept. 28: Though a little soggy from recent rain, the knee-high backstop wall's foundation is taking shape.
Oct. 10: Fence posts installed.
Oct. 10: The drainage system.
Oct. 10: The backstop/knee-wall is nearly complete.
Oct. 10: The knee-wall from a field view.
Oct. 10: The umpire's perspective.
Oct. 10: The batting pavilion flooring is taking shape.
Oct. 10: A view from the stands at Walton Field.
Oct. 11: What a difference a day makes! Infield sod complete, and the outfield is taking its shape.
Oct. 11: The view from the third-base coach's box.
Oct. 11: Down the left field line.
Oct. 11: The view from behind second base.
Oct. 11: The sodding of the outfield is halfway complete.
Oct. 11: What the first base coach sees during the game.
Oct. 11: The catcher's perspective.
Nov. 2: The extensions for seating are taking shape.
Nov. 2: The screen behind home plate is hoisted into place.
Nov. 2: The floor of the batting facility is laid.
Nov. 2: The re-sodding is complete.
Nov. 2: The only thing missing from the knee-wall is the padding.